Equipment Maintenance Safety Plan

Ground Bearing Pressure
Ground Reinforcement Plan

Bearing strength test and securing the required bearing capacity
HANCHANG

Mobile and crawler cranes

1Ground Pressure

The ground load-bearing capacity and the monitoring of the ground pressure are decisive for the safe operation of a crane. Ground Pressure Visualization calculates the current ground pressure of the machine in real time and compares it with the specified safety limits that the operator has entered in the control system.

The ground pressure is displayed on the monitor and the operator is permanently aware of whether the machine is in or approaching a critical area. Dangerous work steps can so be avoided or safely adapted in good time.

  • GROUND REINFORCEMENT PLAN

    • 현장 투입전 사전 현장미팅 진행하여 지반상태 확인
    • 지반 지내력 검사 실시 후 잡석다짐 및 보강매트 포설
    • Rigging Plan을 통한 조립 및 작업구획 설정후 지반보강
  • SUBSTITUTION METHOD

    • 크레인 지반보강(잡석다짐) 후 지내력 확보 우선
    • 연약지반 투입시 2중, 3중으로 지반을 견고히 하여 진행
    • 크레인 본체구간 스틸매트(220T), BW구간 철판(50T) 보강
  • SUBSTITUTION METHOD

    • 크레인 지반보강(잡석다짐) 후 지내력 확보 우선
    • 연약지반 투입시 2중, 3중으로 지반을 견고히 하여 진행
    • 크레인 본체구간 스틸매트(220T), BW구간 철판(50T) 보강

2Ground Reinforcement Plan

Crawler Crane 지반 보강은 꼭 필요한 작업입니다. 지반보강없이 장비가 투입되어 작업할 시 지반이 무너져 대형 사고로 이어지는 경우가 많이 발생 됩니다. 특히 연약지반일 경우 우선적으로 지내 력을 검토하여 작업가능 여부를 판단하여야 하며,지내력이 안나올 경우 지반 보강 계획을 잡고 투입전 지반을 먼저 확보하여 안전한 작업이 진행될 수 있도록 하여야 합니다.

  • GROUND REINFORCEMENT PLAN

    • 현장 투입전 사전 현장미팅 진행하여 지반상태 확인
    • 지반 지내력 검사 실시 후 잡석다짐 및 보강매트 포설
    • Rigging Plan을 통한 조립 및 작업구획 설정후 지반보강
  • SUBSTITUTION METHOD

    • 크레인 지반보강(잡석다짐) 후 지내력 확보 우선
    • 연약지반 투입시 2중, 3중으로 지반을 견고히 하여 진행
    • 크레인 본체구간 스틸매트(220T), BW구간 철판(50T) 보강
  • SUBSTITUTION METHOD

    • 크레인 지반보강(잡석다짐) 후 지내력 확보 우선
    • 연약지반 투입시 2중, 3중으로 지반을 견고히 하여 진행
    • 크레인 본체구간 스틸매트(220T), BW구간 철판(50T) 보강